Advice re: best place for a drain on this new concrete pour

moagra
4 years ago


1) yard drain on the right side, visually outside of new pour

2) drain in middle of new concrete (concern is visual being center of new pad)

3) drain system up against the house: either under new concrete pour or under pavers up against the house.


new concrete pad is 18.5 ft x 8 ft

a downspout is on each side of the pad for tying in


fyi: a skim coat and epoxy overlay will finish off both old and new concrete for seamless look